Not known Facts About construction
If a contractor substitutes unapproved materials, whether or not for cost savings or simplicity of use, they might result in a breach of contract, be pressured to appropriate their work, and also be liable for damages past corrective motion.Design, finance, and authorized facets overlap and interrelate. The look needs to be don't just structurally